Portfolio
Electrical and solar engineering, built and operating across Coahuila and Baja California Sur. Every project on this page is a real installation delivered by our team.
Documented case
Comercializadora Marsa del Norte
A growing business needed a system calibrated to its consumption trend, not its historical average. Our first published engineering design case.
View the case →Derivados López
114 kW grid-tied photovoltaic system for an industrial processing plant in Ciudad Constitución. Sized against the operation's actual consumption and interconnected with CFE. On-site generation covers a significant share of the plant's electrical demand, delivering clean, steady power to sustain the production process.
Casa Rafael Restaurant
22 kW on the restaurant's rooftop to sustain its daily operation. On-site generation in a trade where the cost of power lands straight on the margin of the business. The rooftop array produces energy through the daylight hours, replacing part of the power the restaurant used to draw from the grid.
Marina Puerto Escondido — Docks
Design and build of the complete dockside power supply, with a 1000 kVA main substation and five 300 kVA substations. Reliable distribution across the marina's full operation.
Solar Carport — Marina Puerto Escondido
92.48 kWp solar carport feeding the marina's main substation. The structure generates power and provides shade at once, putting a single footprint to double use.
Marina Seca — Marina Puerto Escondido
102.06 kWp photovoltaic system mounted over the dry-storage building, feeding the main substation. Renewable power for the marina's core operating infrastructure.
Mantarraya Residences
Medium- and low-voltage electrical system built with a 154 kVA emergency generator and transfer switch. Assured backup for critical loads whenever the grid fails.
Villa del Palmar — Phase II
Medium- and low-voltage electrical system for the hotel's second phase, adding 200 new rooms. A 154 kVA generator with automatic transfer keeps the operation running.
Hotel Oasis
11.10 kWp expansion of the hotel's existing photovoltaic array. More energy generated on site to cover a larger share of the lodging operation's daily consumption.
Hotel Posadas del Ryal
14.85 kWp grid-connected photovoltaic system for the hotel. On-site generation that feeds clean energy directly into the daily consumption of the lodging operation.
Nove Cocina Express
17.10 kWp grid-connected photovoltaic system for the restaurant. On-site generation covering part of the heavy energy use a kitchen draws through its working day.
San Juan Restaurant
Low-voltage electrical works plus a 9.5 kWp grid-tied photovoltaic system. Electrical installation and on-site generation delivered in a single project for the restaurant.
Hielera Peralta
40.32 kWp zero-export photovoltaic system: all generation is consumed on site, in a plant where the cold can never stop. Every kWh offsets grid draw, with no surplus fed back.
CCI Puerto San Carlos
Design and rollout of a fiber-optic network at the Puerto San Carlos internal-combustion power plant (CCI), B.C.S. High-speed infrastructure for reliable data transmission across an electricity-generation facility.
Send us your CFE bill and we'll tell you how much you can save. Free diagnostic, no commitment.